Prefabricated Factory Installation Time: How Fast Is It
10.02.2025 Prefabricated factories are building solutions that stand out due to their fast installation advantage. In this article, we will detail the installation processes of prefabricated factories and how quickly they can be completed compared to traditional construction methods.
Stages of the Installation Process
The installation process of a prefabricated factory consists of several key stages:
- Project Planning: Determining the design that meets the client's needs and planning the technical details. This stage usually takes 1-2 weeks.
- Factory Production: The production of modules begins at the factory. This process can take between 2-6 weeks, depending on the size of the project.
- Site Preparation: Leveling the installation site, laying the foundation, and completing infrastructure work. This stage typically takes 1-3 weeks.
- Assembly: The prefabricated modules are assembled on-site. The assembly process generally takes 1-2 weeks.
Advantages of Fast Installation of Prefabricated Factories
- Time Savings: You can save up to 50% of the time compared to traditional construction projects.
- Less Disruption: Thanks to fast installation, the risk of operational disruption for your business is minimized.
- Lower Costs: Projects completed in a short period reduce long-term costs.
The Secret to Fast Installation
The secret behind the fast completion of prefabricated buildings is the simultaneous progression of production and installation processes. While the modules are being produced in the factory, site preparations are completed. This provides a double time-saving compared to traditional construction methods.
Prefabricated factories have become essential for modern businesses due to their fast installation advantage. At Beton Yapı, we provide timely and high-quality solutions tailored to your needs. Contact us for more information.