Prefabricated structures stand out for their fast installation and cost advantages. However, their true success lies in a professionally managed assembly process. In this article, we break down how the prefab installation workflow works step by step.
Soil analysis is crucial before installation. A concrete slab or steel platform is prepared depending on the project needs.
Prefabricated panels, walls, roofs, and floor elements are manufactured at BetonYapı facilities according to quality standards.
Components are delivered to the site with suitable logistics methods. This phase is directly linked to the speed of the overall assembly.
Our expert team follows a strict plan to install walls, roofs, windows, and doors. The full process typically takes between 3 and 10 days.
Once complete, insulation, electrical systems, and plumbing are tested. After approval, the building is ready for use.
BetonYapı offers engineering support at every step of the installation process, ensuring secure, efficient, and aesthetic results.
Depending on the project size, it typically takes between 3 to 10 days.
The customer can prepare the foundation, or BetonYapı can provide it upon request.
Yes, after testing, it’s immediately ready for use.