Beton Yapı
TürkçeEnglish
  • COMPANY
    • Milestones
    • Values
    • Careers
  • BUILDING ELEMENTS
    • Colon
    • Roof Truss (Beam)
    • Wall Panel
    • Purlin Beam
    • Carrier Beam
    • Hollow Flooring
    • TT Plaque Flooring
    • Earthquake Beam
    • Gutter Beam
    • Porch Beam
    • Lantern Beam
    • Crane Beam
  • SERVICES
    • Project
    • Base and Infrastructure
    • Manufacturing
    • Transport
    • Assembly
  • PRODUCTS
    • Single Storey
    • Intermediate Storey
    • Multi-Storey
    • Single Sloping Roof
    • Panel Walled
    • Crane
    • With a Porch
    • Phanariot
    • Different Height
    • Karma
  • REFERENCES
  • BLOG
  • CONTACT
  • COMPANY
    • Milestones
    • Values
    • Careers
  • BUILDING ELEMENTS
    • Colon
    • Roof Truss (Beam)
    • Wall Panel
    • Purlin Beam
    • Carrier Beam
    • Hollow Flooring
    • TT Plaque Flooring
    • Earthquake Beam
    • Gutter Beam
    • Porch Beam
    • Lantern Beam
    • Crane Beam
  • SERVICES
    • Project
    • Base and Infrastructure
    • Manufacturing
    • Transport
    • Assembly
  • PRODUCTS
    • Single Storey
    • Intermediate Storey
    • Multi-Storey
    • Single Sloping Roof
    • Panel Walled
    • Crane
    • With a Porch
    • Phanariot
    • Different Height
    • Karma
  • REFERENCES
  • BLOG
  • CONTACT

How Does the Assembly Process of Prefabricated Structures Work?

25.04.2025

Prefabricated structures stand out for their fast installation and cost advantages. However, their true success lies in a professionally managed assembly process. In this article, we break down how the prefab installation workflow works step by step.

1. Site Survey and Ground Preparation

Soil analysis is crucial before installation. A concrete slab or steel platform is prepared depending on the project needs.

2. Production of Structural Elements

Prefabricated panels, walls, roofs, and floor elements are manufactured at BetonYapı facilities according to quality standards.

3. Transport and Delivery

Components are delivered to the site with suitable logistics methods. This phase is directly linked to the speed of the overall assembly.

4. On-Site Assembly

Our expert team follows a strict plan to install walls, roofs, windows, and doors. The full process typically takes between 3 and 10 days.

5. Final Testing and Handover

Once complete, insulation, electrical systems, and plumbing are tested. After approval, the building is ready for use.

Why Choose BetonYapı?

BetonYapı offers engineering support at every step of the installation process, ensuring secure, efficient, and aesthetic results.

FAQ

How long does prefab installation take?

Depending on the project size, it typically takes between 3 to 10 days.

Who prepares the foundation?

The customer can prepare the foundation, or BetonYapı can provide it upon request.

Is the building usable right after assembly?

Yes, after testing, it’s immediately ready for use.

PREFABRİK YAPI BLOG
  • Prefab Building Trends and Expectations for 2025 30.04.2025
  • Sustainability in the Construction Industry: What Prefabrication Offers 29.04.2025
  • Turnkey Prefabricated Projects with Beton Yapı 28.04.2025
  • How Does the Assembly Process of Prefabricated Structures Work? 25.04.2025
  • Get Inspired by BetonYapı's Reference Projects 24.04.2025
  • Earthquake-Resistant Structures: The Strength of Prefabricated Concrete 23.04.2025
  • Architectural Flexibility in Prefabricated Structures: Design It Your Way 22.04.2025
  • Turn Your Dream of a Detached Home into Reality with Prefabricated Structures 21.04.2025
  • Support the Economy with Locally Produced Prefabricated Structures 18.04.2025
  • Why Is Fire Resistance of Prefabricated Concrete So Important? 17.04.2025
  • Hangi Alanlarda Prefabrik Yapılar Daha Uygun? 16.04.2025
  • Build Modern Workspaces with Prefabricated Office Structures 15.04.2025
  • Time and Cost Savings in Prefabricated Factory Construction 14.04.2025
  • Prefabricated Factory Installation Time: How Fast Is It 10.02.2025
  • Advantages of Prefabricated Factories: Lower Cost, Higher Efficiency 27.01.2025
  • Improve Your Business with Factory Building Projects 06.01.2025
  • Things to Consider When Choosing Prefabricated Construction Companies 17.02.2025
  • Why Should Prefabricated Solutions Be Preferred for Industrial Buildings? 07.04.2025
  • How Are Prefabricated Building Prices Determined? 10.03.2025
  • Prefabricated Building Models: Modern and Functional Designs 13.01.2025
  • Prefabricated Warehouse Construction Processes and Advantages 20.01.2025
  • Prefabricated Industrial Buildings: Fast and Economical Solutions 03.03.2025
  • Everything You Need to Know About Prefabricated Factory Construction 03.02.2025
  • Why are Prefabricated Buildings Environmentally Friendly? 17.03.2025
  • Energy Efficiency and Sustainability of Prefabricated Buildings 31.03.2025
  • Prefabricated Offices and Commercial Buildings: Fast Solution, High Efficiency 24.02.2025
  • What are Prefabricated Buildings and What are Their Advantages Over Traditional Construction? 24.03.2025
  • COMPANY
    • Milestones
    • Values
    • Careers
  • BUILDING ELEMENTS
    • Colon
    • Roof Truss (Beam)
    • Wall Panel
    • Purlin Beam
    • Carrier Beam
    • Hollow Flooring
    • TT Plaque Flooring
    • Earthquake Beam
    • Gutter Beam
    • Porch Beam
    • Lantern Beam
    • Crane Beam
  • SERVICES
    • Project
    • Base and Infrastructure
    • Manufacturing
    • Transport
    • Assembly
  • PRODUCTS
    • Single Storey
    • Intermediate Storey
    • Multi-Storey
    • Single Sloping Roof
    • Panel Walled
    • Crane
    • With a Porch
    • Phanariot
    • Different Height
    • Karma
  • BETON YAPI
    • A Life with Beton Yapı
    • Hollow Flooring Production Line
    • Beton Yapı Production Area
    • Equipment
  • BLOG
  • REFERENCES
  • CONTACT
Beton Yapı
FACTORY
İstasyon Mh. Narlı Yolu Üzeri
1. Km No: 7/C Türkoğlu
Kahramanmaraş
Türkiye
+90 344 618 18 88
+90 533 961 96 60
[email protected]
Bütem Creative